Paraphernalia
PPubMed23 May 2020Cited 4×

Generator Maintenance Scheduling using Exchange Market Algorithm

Learnmore Moyo, Nnamdi I. Nwulu, Uduakobong E. Ekpenyong

Abstract

The Generator Maintenance Schedule model is formulated mathematically as a highly constrained combinatorial optimization problem and it is obligatory to implement a suitable optimization tool to determine the best feasible maintenance schedule. The maintenance schedule obtained has to meet a number of power system constraints. There is increased research in the development of approximate solution methodologies such as heuristic and meta-heuristic techniques [1]. Unlike mathematical methods, metaheuristics can obtain an optimal solution to a complex problem fast and are not subjected to limitations such as linearity, continuity, differentiability and convexity that are faced by mathematical programs [2]. This work presents the application of Exchange Market Algorithm (EMA) to find an optimal maintenance schedule. The algorithm is customized to achieve the following:1. • Selecting the initial population within the maintenance window constraint to enable faster convergence. 2. • Adapt the algorithm to give discrete solutions. 3. • Penalty function included for constraint handling.

A figure from Generator Maintenance Scheduling using Exchange Market Algorithm
fig. from the paper

§ The Valyu brief

Reading the full paper and taking notes. This takes a few seconds…

§ Ask this paper

Ask a question about this paper

Valyu reads the full text and answers from what the paper actually says.

Q.

Searching the other archives…